www.ib-roehrig.de
   
  Home
   
  Engineering
   
  Qualification
  cGMP
  VMP
  DQ
  IQ
  OQ
  PQ
  GAP analysis
   
  References
   
Performance qualification (PQ)    

Documented evidence that a system meets the specifications stipulated in the operator's requirements.

This may comprise the following:

  • System integrations
  • Performance tests during a fixed period under production conditions
  • Installation of placebos

We carry out temperature distribution measurements for:

  • Cooling chambers, refrigerators, deep freezers, incubators, brood chambers
 
 
   
     
   
   
   
Ingenieurbüro Uwe RöhrigImprintContactJobs